Recovery At a Glance

The purpose of this page is to provide a map of the recovery progress on a daily basis for services that are still affected – these are – Primary Power Lines; Customer Connections; Water Wells.

CPUC Sewer Lift Stations and Water Wells are now all energised and operational.

Three Phase Customers are all re-energised;

Click on images to enlarge

Primary Power Status

Primary Line restore Progress 20 jun 15

Single Phase Meter Connection Status

Single Phase Connection Status 20 June 15

P Restore Graph 20 Jun 15

CPUC Load Recovery Graph

CPUC Load Recovery 30  March to 30 May 2015

CPUC Primary System Restoration Progress

Primary Line restore Progress 20 June 2015